|
|
Memorial Health Center - Medford, WI
 |
The Project Scope Included:
-
A new Clinic
-
New Surgical Unit
-
Addition of a new data
-
New fire alarm system
The new surgical unit also included a new Operating Room and replacement of the old power system.
The success of the transition of the old power system over to a new one was significant, resulting in no power outage that exceeded 20 minutes. This was accomplished because of close coordination between Town & Country Electric and the Hospital staff.
We also replaced the old boiler system, as well as the generator plant and constructed a new heating plant that now holds the new boiler and generator plant. |
|
|