USPS MPI - Phases 1 & 2
Location: All throughout the United States
|


|
The Projects Consisted of:
Faith Technologies was not the prime contractor for this contract; we were the main subcontract for an 8(a) contractor.
All of our projects were closely monitored and inspected by Northrop Grumman who was contracted by the USPS to ensure the standards and requirements of the SOO were delivered in all of their installations.
Faith Technologies was extremely successful throughout these installations never failing to meet a deliverable or project milestone.
The projects required Faith Technologies to work in multiple states consecutively and perform site surveys and engineering packages at the same time as well. We also worked diligently through extreme Acts of God (hurricanes and tornados) with little or no burden possible to the customer and end user. |
|
|